TrueStep Manufacturing

The next shift, checked against the rules you actually run

Six questions decide whether a shift runs clean. TrueStep Manufacturing answers all six from your own records, before handoff:

  1. Who is scheduled
  2. Who is actually available
  3. Who is qualified for the work
  4. Where the next shift fails the rule
  5. Who owns the recovery
  6. What changed before handoff
A worked example

What an understaffed shift looks like here

Night shift, packaging line, ten positions. Nine check out against the rules. One does not, and instead of an assumption the board shows an exception with a named owner and a due time.

Exception: Fork 1 · forklift certification cannot be proved current for the assigned operator. Owner: shift supervisor. Due: before 22:00 handoff. Recovery options shown: reassign a certified operator from Pack 2, or verify the certification against the training ledger.

The grid never guesses. A qualification that cannot be proved current reads as unproved, and the shift is only called ready when every rule you run passes or every exception has an owner.